Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0247 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,959 | $1,750 | n/a |
WM0247 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,062 | $0 | n/a |
WM0247 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,444 | $1,640 | n/a |
WM0247 # 03 Y:2025 | 03 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,473 | $2,950 | n/a |
WM0247 # 02 Y:2025 | 02 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,533 | $1,020 | n/a |
WM0247 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,641 | $0 | n/a |
UL2508 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,012 | $3,773 | n/a |
UL2508 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,405 | $305,296 | n/a |
UL2508 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,751 | $375 | n/a |
UL2508 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $43,597 | $30,000 | n/a |
UL2508 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $55 | $237 | n/a |
UL2508 # 05 Y:2025 | 05 | 2025 | INSTALL SPECTRAL REFLECTORS / DELAMP | $141 | $0 | n/a |
UL2508 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,829 | $840 | n/a |
UL2508 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $53,908 | $84,265 | n/a |
UL2508 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $25,350 | $14,859 | n/a |
LS2506 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $135 | n/a |
LS2506 # 08 Y:2025 | 08 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,930 | $80,003 | n/a |
LS2506 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,703 | $514,800 | n/a |
LS2506 # 06 Y:2025 | 06 | 2025 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $3,451 | $15,964 | n/a |
LS2506 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $9,990 | n/a |
LS2506 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $24,849 | $20,250 | n/a |
LS2506 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $427 | $50 | n/a |
LS2506 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $4,511 | $500 | n/a |