IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

340

matching recommendations
Reset
SIC 2211 Broadwoven Fabric Mills, Cotton
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0970 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,757 $200 n/a
GT0970 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $93,953 $385,000 n/a
GT0970 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,120 $1,934,090 n/a
GT0970 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,613 $75 n/a
GT0970 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,675 $1,850 n/a
GT0970 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $268 $456 n/a
UU0175 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,660 $6,931 Not Implemented
UU0175 # 05 Y:2021 05 2021 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $4,532 $6,178 Implemented
UU0175 # 02 Y:2021 02 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $31,653 $35,841 Implemented
UU0175 # 01 Y:2021 01 2021 ELIMINATE/REDUCE AN OPERATION $154,852 $42,000 Implemented
UU0175 # 03 Y:2021 03 2021 REPLACE BOILER $8,979 $46,872 Implemented
UU0175 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,780 $7,027 Not Implemented
GT0921 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $947 $3,500 Implemented
GT0921 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $1,446 $1,974 Not Implemented
GT0921 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $6,221 $200 Not Implemented
GT0921 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $543 $847 Not Implemented
GT0921 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,972 $32,568 Not Implemented
CL1804 # 05 Y:2018 05 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,121 $34,121 Not Implemented
CL1804 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $42,335 $15,500 Not Implemented
CL1804 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $39,409 $3,050 Implemented
CL1804 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,306 $184,601 Implemented
CL1804 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156,853 $28,500 Implemented
CL1706 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,574 $139,384 Not Implemented
CL1706 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,345 $623 Not Implemented
CL1706 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $66,077 $125,000 Not Implemented