Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
100
matching recommendationsSIC | 2211 | Broadwoven Fabric Mills, Cotton |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0921 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,972 | $32,568 | Not Implemented |
GT0921 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $947 | $3,500 | Implemented |
GT0921 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $543 | $847 | Not Implemented |
GT0921 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $1,446 | $1,974 | Not Implemented |
GT0921 # 01 Y:2019 | 01 | 2019 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $6,221 | $200 | Not Implemented |
GT0842 # 02 Y:2007 | 02 | 2007 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $17,400 | $27,000 | Not Implemented |
GT0842 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,980 | $1,603 | Implemented |
GT0842 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,060 | $26,800 | Not Implemented |
GT0842 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $76,200 | $20,000 | Not Implemented |
GT0842 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,090 | $3,900 | Implemented |
GT0842 # 06 Y:2007 | 06 | 2007 | USE WATER-BASED ADHESIVES | $1,960 | $0 | Implemented |
GT0842 # 07 Y:2007 | 07 | 2007 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $63,520 | $7,000 | Implemented |
GT0842 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,470 | $11,100 | Not Implemented |
GT0819 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,054 | $214,725 | Not Implemented |
GT0819 # 01 Y:2006 | 01 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $140,000 | $10,000 | Implemented |
GT0819 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,030 | $4,800 | Implemented |
GT0819 # 03 Y:2006 | 03 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,798 | $5,000 | Implemented |
GT0819 # 04 Y:2006 | 04 | 2006 | DISCONNECT BALLASTS | $2,735 | $3,678 | Implemented |
GT0819 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $82,242 | $108,000 | Not Implemented |
GT0819 # 05 Y:2006 | 05 | 2006 | USE EXISTING DAM TO GENERATE ELECTRICITY | $106,850 | $94,000 | Implemented |
GT0819 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,620 | $114,950 | Not Implemented |
GT0819 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $298,817 | $375,000 | Not Implemented |
GT0767 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $2,317 | $298 | Not Implemented |
GT0767 # 03 Y:2003 | 03 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $15,699 | $2,088 | Implemented |
GT0767 # 05 Y:2003 | 05 | 2003 | USE OPTIMUM TEMPERATURE | $9,365 | $5,650 | Not Implemented |