Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
206
matching recommendationsSIC | 2252 | Hosiery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0595 # 04 Y:2017 | 04 | 2017 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $3,516 | $400 | Implemented |
NC0595 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $910 | $2,000 | Not Implemented |
NC0595 # 03 Y:2017 | 03 | 2017 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $375 | $552 | Implemented |
NC0595 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $896 | $100 | Implemented |
NC0595 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,435 | $144,553 | Not Implemented |
NC0547 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,433 | $11,840 | Implemented |
NC0547 # 11 Y:2015 | 11 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,688 | $281 | Implemented |
NC0547 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,425 | $100 | Implemented |
NC0547 # 04 Y:2015 | 04 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $675 | $1,800 | Not Implemented |
NC0547 # 09 Y:2015 | 09 | 2015 | REDESIGN PROCESS | $461 | $2,000 | Not Implemented |
NC0547 # 13 Y:2015 | 13 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $675 | $200 | Implemented |
NC0547 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,570 | $50,000 | Not Implemented |
NC0547 # 12 Y:2015 | 12 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $231 | $1,000 | Implemented |
NC0547 # 10 Y:2015 | 10 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,028 | $4,256 | Implemented |
NC0547 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $88 | $100 | Not Implemented |
NC0547 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,024 | $100 | Not Implemented |
NC0547 # 07 Y:2015 | 07 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $883 | $500 | Not Implemented |
NC0547 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $3,947 | $2,800 | Implemented |
NC0505 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,186 | $100 | Implemented |
NC0505 # 09 Y:2014 | 09 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,259 | $4,256 | Implemented |
NC0505 # 02 Y:2014 | 02 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,010 | $20,000 | Not Implemented |
NC0505 # 06 Y:2014 | 06 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,874 | $200 | Implemented |
NC0505 # 05 Y:2014 | 05 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $1,108 | $100 | Implemented |
NC0505 # 01 Y:2014 | 01 | 2014 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $1,293 | $200 | Implemented |
NC0505 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,993 | $319 | Implemented |