IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

206

matching recommendations
Reset
SIC 2252 Hosiery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0413 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $621 $122 Implemented
GT0413 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $650 $450 Implemented
GT0413 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $129 $703 Implemented
GT0413 # 04 Y:1990 04 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,190 $73,850 Not Implemented
GT0413 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,170 $1,120 Not Implemented
GT0413 # 06 Y:1990 06 1990 INSULATE BARE EQUIPMENT $710 $850 Not Implemented
TN0411 # 01 Y:1990 01 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $1,200 $475 Implemented
TN0411 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,431 $0 Not Implemented
TN0411 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $681 $1,850 Implemented
TN0411 # 04 Y:1990 04 1990 REPAIR AND ELIMINATE STEAM LEAKS $429 $190 Implemented
TN0411 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $354 Implemented
TN0411 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $948 $0 Implemented
TN0411 # 07 Y:1990 07 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $211 $482 Implemented
TN0411 # 08 Y:1990 08 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $626 $210 Implemented
TN0411 # 09 Y:1990 09 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $317 $0 Implemented
TN0411 # 10 Y:1990 10 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $246 $635 Not Implemented
AT0125 # 01 Y:1989 01 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $33,982 $5,000 Implemented
AT0125 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,988 $1,306 Implemented
AT0125 # 03 Y:1989 03 1989 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,395 $15,000 Implemented
AT0125 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,202 $160 Implemented
AT0125 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,671 $5,500 Implemented
AT0126 # 01 Y:1989 01 1989 CLOSE OFF UNNEEDED STEAM LINES $3,825 $5,000 Not Implemented
AT0126 # 02 Y:1989 02 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,066 $10,000 Implemented
AT0126 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $5,066 $10,311 Implemented
AT0126 # 04 Y:1989 04 1989 REPAIR AND ELIMINATE STEAM LEAKS $2,533 $500 Implemented