IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2252 Hosiery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0411 # 10 Y:1990 10 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $246 $635 Not Implemented
TN0411 # 09 Y:1990 09 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $317 $0 Implemented
TN0411 # 08 Y:1990 08 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $626 $210 Implemented
TN0411 # 07 Y:1990 07 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $211 $482 Implemented
TN0411 # 06 Y:1990 06 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $948 $0 Implemented
TN0411 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,377 $354 Implemented
TN0411 # 04 Y:1990 04 1990 REPAIR AND ELIMINATE STEAM LEAKS $429 $190 Implemented
TN0411 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $681 $1,850 Implemented
TN0411 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,431 $0 Not Implemented
TN0411 # 01 Y:1990 01 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $1,200 $475 Implemented
TN0232 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $2,734 $855 Not Implemented
TN0232 # 07 Y:1984 07 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,670 $462 Implemented
TN0232 # 05 Y:1984 05 1984 REPAIR AND ELIMINATE STEAM LEAKS $3,742 $140 Implemented
TN0232 # 04 Y:1984 04 1984 COVER OPEN TANKS $5,089 $2,750 Not Implemented
TN0232 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,298 $0 Implemented
TN0232 # 02 Y:1984 02 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,721 $18,050 Not Implemented
TN0232 # 01 Y:1984 01 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $31,111 $4,573 Implemented
TN0183 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $1,268 $1,790 Not Implemented
TN0183 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,810 $2,000 Implemented
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented
TN0151 # 01 Y:1982 01 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $3,090 $650 Not Implemented
TN0151 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $2,200 Not Implemented
TN0151 # 02 Y:1982 02 1982 INSULATE BARE EQUIPMENT $260 $100 Not Implemented