IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 2254 Knit Underwear Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0341 # 12 Y:2018 12 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $803 $1,560 Not Implemented
MI0341 # 11 Y:2018 11 2018 INSTALL OCCUPANCY SENSORS $3,246 $2,109 Not Implemented
MI0341 # 10 Y:2018 10 2018 OPTIMIZE PLANT POWER FACTOR $17,936 $25,045 Not Implemented
MI0341 # 09 Y:2018 09 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,956 $7,314 Not Implemented
MI0341 # 08 Y:2018 08 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,872 $3,380 Not Implemented
MI0341 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,466 $38,639 Not Implemented
MI0341 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,910 $35,323 Not Implemented
MI0341 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,949 $6,410 Not Implemented
MI0341 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $59,009 $48,268 Not Implemented
MI0341 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $69,002 $300,000 Not Implemented
MI0341 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,087 $115,295 Not Implemented
MI0341 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142,227 $2,030 Not Implemented
NC0521 # 09 Y:2014 09 2014 DEVELOP A REPAIR/REPLACE POLICY $2,162 $4,256 Implemented
NC0521 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $364,896 $1,350,000 Implemented
NC0521 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $123,080 $103,307 Not Implemented
NC0521 # 03 Y:2014 03 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $57,030 $40,000 Implemented
NC0521 # 04 Y:2014 04 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,678 $40,000 Not Implemented
NC0521 # 05 Y:2014 05 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $41,376 $72,000 Not Implemented
NC0521 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,043 $5,100 Implemented
NC0521 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,870 $102,717 Implemented
NC0521 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,313 $650 Implemented
GT0292 # 07 Y:1986 07 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,550 $1,920 Implemented
GT0292 # 06 Y:1986 06 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $517 $1,993 Implemented
GT0292 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,750 $14,700 Implemented
GT0292 # 04 Y:1986 04 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $15,300 $22,400 Implemented