IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

220

matching recommendations
Reset
SIC 226 Textile Finishing, Except Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0487 # 09 Y:2020 09 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,451 $15,000 Implemented
LE0487 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,408 $16,552 Implemented
LE0487 # 11 Y:2020 11 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,929 $30,000 Implemented
LE0487 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $728 $40 Implemented
MI0307 # 13 Y:2017 13 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $692 $240 Implemented
MI0307 # 14 Y:2017 14 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $359 $40 Implemented
MI0307 # 08 Y:2017 08 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,536 $3,370 Implemented
MI0307 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $12,345 $3,600 Implemented
MI0307 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,347 $1,660 Implemented
MI0307 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,777 $23,135 Implemented
MI0307 # 07 Y:2017 07 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,323 $1,720 Implemented
MA0766 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $3,894 $2,462 Implemented
MA0766 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,855 $2,000 Implemented
MA0766 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $50,500 Implemented
MA0729 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $200 Implemented
MA0729 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,956 $3,300 Implemented
MA0729 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,490 $500 Implemented
NC0499 # 13 Y:2013 13 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,510 $100 Implemented
NC0499 # 01 Y:2013 01 2013 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $52,036 $15,000 Implemented
NC0499 # 02 Y:2013 02 2013 OPERATE BOILERS ON HIGH FIRE SETTING $17,607 $1,000 Implemented
NC0499 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,448 $18,119 Implemented
NC0499 # 07 Y:2013 07 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,306 $1,750 Implemented
NC0499 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,040 $12,800 Implemented
NC0499 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,194 $451 Implemented
NC0499 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $2,055 $4,256 Implemented