IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 226 Textile Finishing, Except Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0743 # 08 Y:2002 08 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,666 $0 Not Implemented
GT0743 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,206 $17,240 Not Implemented
GT0743 # 06 Y:2002 06 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,792 $5,050 Not Implemented
GT0743 # 05 Y:2002 05 2002 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $78,433 $112,650 Not Implemented
GT0743 # 04 Y:2002 04 2002 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $10,781 $1,720 Implemented
GT0743 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $671 $0 Not Implemented
GT0743 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $5,598 $0 Not Implemented
GT0743 # 01 Y:2002 01 2002 USE MINIMUM STEAM OPERATING PRESSURE $1,259 $0 Implemented
MA0516 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,704 $15,768 Not Implemented
MA0516 # 01 Y:2002 01 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $151,365 $135,000 Implemented
MA0516 # 08 Y:2002 08 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $560 $0 Not Implemented
MA0516 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $966 $625 Implemented
MA0516 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,589 $5,200 Implemented
MA0516 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,745 $460 Implemented
MA0516 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $5,343 $8,400 Implemented
MA0516 # 03 Y:2002 03 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,155 $19,000 Not Implemented
MA0516 # 02 Y:2002 02 2002 MINIMIZE WATER USAGE $43,582 $43,100 Not Implemented