IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

100

matching recommendations
Reset
SIC 2269 Finishing Plants, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0487 # 11 Y:2020 11 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,929 $30,000 Implemented
LE0487 # 03 Y:2020 03 2020 REPAIR OR REPLACE STEAM TRAPS $11,267 $5,000 Implemented
LE0487 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,823 $10,000 Implemented
LE0487 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $5,562 $1,833 Implemented
LE0487 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $728 $40 Implemented
LE0487 # 10 Y:2020 10 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,832 $8,000 Implemented
LE0487 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,408 $16,552 Implemented
LE0487 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $399 $975 Implemented
LE0487 # 09 Y:2020 09 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,451 $15,000 Implemented
DL0052 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,650 $1,019 Implemented
DL0052 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $3,810 $560 Implemented
DL0052 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,560 $200 Implemented
DL0052 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,250 $9,000 Implemented
DL0052 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,940 $1,500 Implemented
DL0052 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,040 $720 Implemented
SU0278 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,050 $0 Implemented
SU0278 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,049 $6,721 Implemented
SU0278 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $44,212 $7,299 Implemented
SU0278 # 10 Y:2009 10 2009 OPTIMIZE PLANT POWER FACTOR $7,344 $28,458 Implemented
SU0278 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,305 $528 Implemented
SU0278 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,615 $410 Implemented
SU0278 # 01 Y:2009 01 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $25,359 $0 Implemented
GT0743 # 04 Y:2002 04 2002 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $10,781 $1,720 Implemented
GT0743 # 01 Y:2002 01 2002 USE MINIMUM STEAM OPERATING PRESSURE $1,259 $0 Implemented
NC0225 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,625 $33,848 Implemented