IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 2273 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0838 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,095 $55,000 Not Implemented
UD0838 # 03 Y:2011 03 2011 UPGRADE OBSOLETE EQUIPMENT $14,654 $20,000 Implemented
UD0838 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,238 $500 Implemented
UD0838 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,034 $7,000 Not Implemented
UD0838 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,370 $124,541 Not Implemented
UD0838 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,828 $100,000 Not Implemented
UD0838 # 08 Y:2011 08 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,630 $78,000 Not Implemented
UD0838 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,585 $15,000 Not Implemented
UD0838 # 10 Y:2011 10 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,749 $125 Implemented
UD0838 # 01 Y:2011 01 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,635 $15,000 Not Implemented
WV0159 # 11 Y:1999 11 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $108,645 $100,000 Implemented
WV0159 # 10 Y:1999 10 1999 RECOVER AND REUSE WASTE MATERIAL $18,805 $50 Not Implemented
WV0159 # 09 Y:1999 09 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,660 $55 Implemented
WV0159 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $175 Implemented
WV0159 # 07 Y:1999 07 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,691 $4,100 Not Implemented
WV0159 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $100 Implemented
WV0159 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $30 Implemented
WV0159 # 04 Y:1999 04 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,860 $3,870 Not Implemented
WV0159 # 03 Y:1999 03 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $60,045 $26,400 Not Implemented
WV0159 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $18,085 $24,240 Not Implemented
WV0159 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $566 $512 Implemented