IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2273 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0504 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,200 $12,725 Not Implemented
SD0504 # 02 Y:2010 02 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $188,550 $211,240 Not Implemented
SD0504 # 03 Y:2010 03 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,846 $20,000 Not Implemented
SD0504 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,360 $7,010 Not Implemented
SD0504 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,983 $11,585 Not Implemented
GT0876 # 02 Y:2010 02 2010 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $307 $50 Not Implemented
GT0876 # 03 Y:2010 03 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,989 $10,500 Not Implemented
GT0876 # 04 Y:2010 04 2010 REPAIR AND ELIMINATE STEAM LEAKS $1,027 $300 Implemented
GT0876 # 05 Y:2010 05 2010 USE OPTIMUM TEMPERATURE $103,726 $187,530 Implemented
GT0876 # 06 Y:2010 06 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,041 $20,000 Not Implemented
GT0876 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,786 $1,500 Implemented
UA3007 # 05 Y:2010 05 2010 USE OPTIMUM THICKNESS INSULATION $6,726 $6,485 Not Implemented
UA3007 # 04 Y:2010 04 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $91,320 $84,320 Not Implemented
UA3007 # 03 Y:2010 03 2010 REPAIR AND ELIMINATE STEAM LEAKS $4,643 $3,840 Not Implemented
UA3007 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $4,977 $2,445 Implemented
UA3007 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $45,702 $105,000 Not Implemented
UA0050 # 06 Y:2010 06 2010 REPAIR AND ELIMINATE STEAM LEAKS $70,430 $4,075 Not Implemented
UA0050 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,300 $160 Implemented
UA0050 # 05 Y:2010 05 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $4,904 $2,890 Implemented
UA0050 # 04 Y:2010 04 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $103,313 $74,525 Not Implemented
UA0050 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,529 $45,740 Implemented
UA0050 # 02 Y:2010 02 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $123,482 $302,000 Implemented
UA0050 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $75,096 $640 Not Implemented