IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 2281 Yarn Spinning Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0141 # 05 Y:1998 05 1998 INSTALL TURBULATORS $11,553 $3,500 Not Implemented
NC0141 # 06 Y:1998 06 1998 BURN A LESS EXPENSIVE GRADE OF FUEL $6,874 $0 Not Implemented
NC0141 # 07 Y:1998 07 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,861 $200 Implemented
NC0141 # 08 Y:1998 08 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $124,752 $270,000 Not Implemented
NC0141 # 09 Y:1998 09 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $22,000 $67,000 Not Implemented
NC0141 # 10 Y:1998 10 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $14,000 $50,000 Not Implemented
NC0112 # 01 Y:1997 01 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,780 $0 n/a
NC0112 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,183 $397 n/a
NC0112 # 03 Y:1997 03 1997 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,601 $20 n/a
NC0112 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,698 $300 n/a
NC0112 # 05 Y:1997 05 1997 RECOVER AND REUSE WASTE MATERIAL $16,220 $260 n/a
NC0112 # 06 Y:1997 06 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,750 $10,280 n/a
NC0112 # 07 Y:1997 07 1997 EXPAND OPERATIONS INTO UNUSED SPACE $60,000 $1,080 n/a
NC0103 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,500 $6,167 Implemented
NC0103 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,267 $2,925 Not Implemented
NC0103 # 03 Y:1996 03 1996 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,391 $5,000 Not Implemented
NC0103 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,152 $350 Implemented
NC0103 # 05 Y:1996 05 1996 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,167 $530 Implemented
NC0103 # 06 Y:1996 06 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,100 $10,000 Implemented
NC0103 # 07 Y:1996 07 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $192 $100 Not Implemented
NC0059 # 01 Y:1995 01 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,340 $0 Implemented
NC0059 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $802 $450 Implemented
NC0059 # 03 Y:1995 03 1995 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $95,329 $560,000 Not Implemented
NC0059 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,062 $1,540 Implemented
NC0059 # 05 Y:1995 05 1995 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,149 $7,500 Not Implemented