Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
94
matching recommendationsSIC | 2282 | Throwing And Winding Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0192 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $70,431 | $386,914 | Not Implemented |
UA0192 # 05 Y:2018 | 05 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $76,893 | $19,300 | Implemented |
UA0192 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,821 | $22,134 | Not Implemented |
UA0192 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,273 | $3,165 | Implemented |
UA0192 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,416 | $200 | Implemented |
UA0192 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $1,298 | $366 | Not Implemented |
GT0867 # 04 Y:2009 | 04 | 2009 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,518 | $6,000 | Implemented |
GT0867 # 02 Y:2009 | 02 | 2009 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $8,794 | $4,000 | Implemented |
GT0867 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,318 | $89,971 | Not Implemented |
GT0867 # 06 Y:2009 | 06 | 2009 | USE SYNTHETIC LUBRICANT | $1,440 | $0 | Implemented |
GT0867 # 05 Y:2009 | 05 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,949 | $0 | Not Implemented |
GT0867 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,426 | $3,250 | Implemented |
GT0739 # 05 Y:2002 | 05 | 2002 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,700 | $300 | Implemented |
GT0739 # 07 Y:2002 | 07 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $3,488 | $0 | Implemented |
GT0739 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $658 | $500 | Implemented |
GT0739 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,130 | $7,000 | Not Implemented |
GT0739 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $19,440 | $122,500 | Not Implemented |
GT0739 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,450 | $50,177 | Implemented |
GT0739 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,592 | $1,900 | Implemented |
GT0739 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $186 | $16,560 | Not Implemented |
HO0161 # 03 Y:1997 | 03 | 1997 | INSTALL / REPAIR INSULATION ON STEAM LINES | $723 | $385 | Implemented |
HO0161 # 04 Y:1997 | 04 | 1997 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,370 | $5,000 | Not Implemented |
HO0161 # 06 Y:1997 | 06 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,130 | $100 | Not Implemented |
HO0161 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,362 | $11,311 | Implemented |
HO0161 # 02 Y:1997 | 02 | 1997 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,635 | $1,878 | Not Implemented |