IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0168 # 05 Y:1996 05 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $38,756 $1,750 Implemented
AS0168 # 06 Y:1996 06 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,824 $0 Implemented
AS0168 # 09 Y:1996 09 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,991 $7,201 Implemented
AS0168 # 10 Y:1996 10 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $228 $0 Implemented
AS0168 # 11 Y:1996 11 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,557 $11,870 Implemented
AS0168 # 12 Y:1996 12 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,967 $8,690 Implemented
AS0168 # 13 Y:1996 13 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,455 $1,200 Implemented
UM0041 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,302 $926 Implemented
UM0041 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,228 $56,789 Implemented
GT0556 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,823 $11,120 Implemented
GT0556 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,150 $24,310 Implemented
TN0563 # 01 Y:1995 01 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,547 $16,638 Implemented
TN0563 # 02 Y:1995 02 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $816 $134 Implemented
TN0563 # 03 Y:1995 03 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $3,191 $0 Implemented
TN0563 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $701 Implemented
TN0563 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,625 $1,540 Implemented
TN0563 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $303 $170 Implemented
TN0563 # 08 Y:1995 08 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,313 $0 Implemented
TN0563 # 12 Y:1995 12 1995 PURCHASE HIGH MATERIALS IN RETURNABLE BULK CONTAINERS $11,700 $10,200 Implemented
NC0055 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,521 $1,200 Implemented
NC0055 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,431 $480 Implemented
NC0055 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $3,360 Implemented
NC0054 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,092 $360 Implemented
NC0054 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,438 $5,749 Implemented
ME0155 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,097 $20,385 Implemented