IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

888

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0571 # 05 Y:2005 05 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,826 $29,170 Implemented
MA0571 # 06 Y:2005 06 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,702 $1,962 Not Implemented
MA0571 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $735 $1,450 Not Implemented
MA0569 # 01 Y:2005 01 2005 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $67,271 $331,800 Not Implemented
MA0569 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,234 $7,312 Implemented
MA0569 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,082 $494 Implemented
MA0569 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $5,248 Implemented
NC0282 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $99,451 $151,800 n/a
NC0282 # 02 Y:2004 02 2004 REDESIGN PROCESS $5,960 $6,000 n/a
NC0282 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,098 $1,000 n/a
NC0282 # 04 Y:2004 04 2004 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,574 $1,000 n/a
NC0282 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $240 n/a
NC0282 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $936 n/a
NC0267 # 01 Y:2003 01 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $869 $0 Not Implemented
NC0267 # 02 Y:2003 02 2003 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $6,222 $9,225 Not Implemented
NC0267 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,018 $9,911 Not Implemented
NC0267 # 04 Y:2003 04 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,686 $700 Implemented
NC0267 # 05 Y:2003 05 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,004 $12,000 Implemented
NC0267 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $410 $100 Implemented
NC0267 # 07 Y:2003 07 2003 RECOVER AND REUSE COOLING WATER $64,159 $0 Not Implemented
WI0447 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,019 $150,000 Not Implemented
WI0447 # 02 Y:2003 02 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,058 $4,500 Implemented
WI0447 # 03 Y:2003 03 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,071 $2,000 Not Implemented
WI0447 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $381 $740 Not Implemented
WI0447 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,938 $2,600 Implemented