IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

902

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL1802 # 01 Y:2018 01 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,952 $0 Not Implemented
TT0199 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,715 $11,600 Not Implemented
TT0199 # 04 Y:2017 04 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,003 $25 Not Implemented
TT0199 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $5,729 $8,000 Not Implemented
TT0199 # 02 Y:2017 02 2017 REPAIR OR REPLACE STEAM TRAPS $14,682 $4,830 Not Implemented
TT0199 # 01 Y:2017 01 2017 CLEAN FOULING FROM WATER LINES REGULARLY $91,197 $8,500 Not Implemented
GT0900 # 01 Y:2017 01 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,820 $250 Implemented
GT0900 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,671 $250 Implemented
GT0900 # 03 Y:2017 03 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,890 $180 Implemented
GT0900 # 04 Y:2017 04 2017 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $42,468 $8,000 Not Implemented
GT0900 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,980 $127,113 Implemented
GT0900 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $16,527 $106,785 Not Implemented
NC0589 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $100 Implemented
NC0589 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $300 Implemented
NC0589 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,155 $66,186 Implemented
NC0589 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,357 $1,000 Implemented
NC0589 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,876 $840 Implemented
NC0589 # 05 Y:2017 05 2017 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,593 $10,750 Not Implemented
NC0589 # 04 Y:2017 04 2017 IMPROVE SPACE COMFORT CONDITIONING $28,966 $135,750 Not Implemented
NC0589 # 03 Y:2017 03 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,455 $10,000 Not Implemented
NC0589 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,080 $19,100 Not Implemented
NC0589 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,378 $62,575 Not Implemented
UA0175 # 08 Y:2017 08 2017 INSTALL TIMERS AND/OR THERMOSTATS $402 $30 Implemented
UA0175 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $1,165 Implemented
UA0175 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,831 $250 Implemented