IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented
MA0742 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,112 $4,285 Not Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 04 Y:2015 04 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,330 $1,000 Not Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
MA0742 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $55,652 $120,000 Not Implemented
MA0224 # 06 Y:1991 06 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,765 $1,500 Not Implemented
MA0224 # 08 Y:1991 08 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,542 $1,060 Implemented
MA0224 # 07 Y:1991 07 1991 INSULATE BARE EQUIPMENT $1,859 $2,250 Implemented
MA0224 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,079 $16,200 Implemented
MA0224 # 04 Y:1991 04 1991 REPAIR OR REPLACE STEAM TRAPS $21,213 $35,000 Implemented
MA0224 # 03 Y:1991 03 1991 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $25,667 $19,927 Not Implemented
MA0224 # 02 Y:1991 02 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $71,552 $0 Not Implemented
MA0224 # 01 Y:1991 01 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,881 $0 Not Implemented
MA0117 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $625 $105 Implemented
MA0117 # 06 Y:1988 06 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,656 $2,040 Not Implemented
MA0117 # 05 Y:1988 05 1988 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $340 $0 Implemented
MA0117 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $240 $75 Implemented
MA0117 # 03 Y:1988 03 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,384 $5,878 Not Implemented