Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
715
matching recommendationsSIC | 229 | Miscellaneous Textile Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0583 # 07 Y:2010 | 07 | 2010 | USE SYNTHETIC LUBRICANT | $130 | $0 | Implemented |
AM0583 # 02 Y:2010 | 02 | 2010 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $7,360 | $0 | Implemented |
AM0583 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $210 | $10 | Implemented |
AM0583 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,970 | $26,490 | Implemented |
AM0583 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,447 | $680 | Implemented |
AM0583 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,120 | $500 | Implemented |
AM0583 # 05 Y:2010 | 05 | 2010 | PAY UTILITY BILLS ON TIME | $479 | $0 | Implemented |
NC0407 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,606 | $1,000 | Implemented |
NC0407 # 01 Y:2010 | 01 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,128 | $60,000 | Implemented |
NC0407 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $50 | Not Implemented |
NC0407 # 02 Y:2010 | 02 | 2010 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $35,567 | $200,000 | Not Implemented |
NC0407 # 06 Y:2010 | 06 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,776 | $6,897 | Implemented |
NC0407 # 04 Y:2010 | 04 | 2010 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,147 | $42,000 | Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
OK0784 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $888 | $1,098 | Not Implemented |
OK0784 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $362 | $1,013 | Not Implemented |
OK0784 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $1,600 | $620 | Not Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 03 Y:2009 | 03 | 2009 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $11,003 | $0 | Not Implemented |
LE0291 # 03 Y:2009 | 03 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,557 | $2,500 | Implemented |
LE0291 # 01 Y:2009 | 01 | 2009 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $32,078 | $50,000 | Not Implemented |
LE0291 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,457 | $1,120 | Implemented |