IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

260

matching recommendations
Reset
SIC 2295 Coated Fabrics, Not Rubberized
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0407 # 02 Y:2010 02 2010 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $35,567 $200,000 Not Implemented
NC0407 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,606 $1,000 Implemented
NC0407 # 04 Y:2010 04 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,147 $42,000 Implemented
NC0407 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $350 $50 Not Implemented
NC0407 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $6,897 Implemented
LE0291 # 11 Y:2009 11 2009 INSTALL OCCUPANCY SENSORS $3,572 $1,050 Not Implemented
LE0291 # 10 Y:2009 10 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,803 $19,856 Not Implemented
LE0291 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,236 $81,400 Not Implemented
LE0291 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,836 $560 Implemented
LE0291 # 07 Y:2009 07 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,975 $3,460 Not Implemented
LE0291 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,837 $125 Not Implemented
LE0291 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,439 $1,600 Not Implemented
LE0291 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,457 $1,120 Implemented
LE0291 # 03 Y:2009 03 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,557 $2,500 Implemented
LE0291 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,489 $510 Not Implemented
LE0291 # 01 Y:2009 01 2009 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $32,078 $50,000 Not Implemented
TT0018 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $314,600 $100,000 Not Implemented
TT0018 # 02 Y:2008 02 2008 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $33,000 $1,000 Implemented
TT0018 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,809 $22,423 Implemented
TT0018 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $5,950 Implemented
MS0295 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,014 $410 Not Implemented
MS0295 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $395 $48 Implemented
MS0295 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,542 $3,825 Implemented
MS0295 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,061 $87,943 Implemented
MS0295 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $6,813 $37 Implemented