Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
355
matching recommendationsSIC | 2299 | Textile Goods, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0223 # 05 Y:2005 | 05 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,729 | $3,850 | Not Implemented |
SU0223 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,353 | $135 | Implemented |
SU0223 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,819 | $357 | Not Implemented |
SU0223 # 02 Y:2005 | 02 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,040 | $0 | Not Implemented |
SU0223 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,360 | $0 | Not Implemented |
GT0804 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,306 | $75,000 | Not Implemented |
GT0804 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,926 | $12,224 | Implemented |
GT0804 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,432 | $2,500 | Implemented |
GT0804 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,303 | $1,600 | Implemented |
GT0804 # 02 Y:2005 | 02 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $289 | $500 | Implemented |
GT0804 # 01 Y:2005 | 01 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,261 | $1,200 | Not Implemented |
MA0569 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $5,248 | Implemented |
MA0569 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $67,271 | $331,800 | Not Implemented |
MA0569 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,234 | $7,312 | Implemented |
MA0569 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $1,082 | $494 | Implemented |
NC0267 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $410 | $100 | Implemented |
NC0267 # 04 Y:2003 | 04 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,686 | $700 | Implemented |
NC0267 # 05 Y:2003 | 05 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,004 | $12,000 | Implemented |
NC0267 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,018 | $9,911 | Not Implemented |
NC0267 # 01 Y:2003 | 01 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $869 | $0 | Not Implemented |
NC0267 # 07 Y:2003 | 07 | 2003 | RECOVER AND REUSE COOLING WATER | $64,159 | $0 | Not Implemented |
NC0267 # 02 Y:2003 | 02 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $6,222 | $9,225 | Not Implemented |
WI0447 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $62,019 | $150,000 | Not Implemented |
WI0447 # 02 Y:2003 | 02 | 2003 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $6,058 | $4,500 | Implemented |
WI0447 # 03 Y:2003 | 03 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $2,071 | $2,000 | Not Implemented |