Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2003 |
Principal Product | Velour fabrics for recliners |
NAICS | 313310 - Textile and Fabric Finishing Mills |
SIC | 2299 - Textile Goods, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 275 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 99,000,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $598,291 | 21,956,016 | kWh | $0.03 |
Electricity Demand | $473,209 | 54,027 | kW-months/year | $8.76 |
Electricity Fees | $30,002 | - | $ | - |
Natural Gas | $1,622,111 | 303,004 | MMBtu | $5.35 |
TOTAL ENERGY COSTS | $2,723,613 | |||
RECOMMENDED SAVINGS* | $81,368 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,100 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $869 Cost: - |
- | - | $869 | 104 | - | - | - | - | - | - | - | - |
- - kWh |
$869 104 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING |
Savings: $6,222 Cost: $9,225 |
- | - | - | - | $6,222 | 1,163 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,222 1,163 MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,018 Cost: $9,911 |
$3,462 | 128,229 | $1,556 | 187 | - | - | - | - | - | - | - | - |
$3,462 128,229 kWh |
$1,556 187 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,686 Cost: $700 |
$1,043 | 38,640 | $643 | 77 | - | - | - | - | - | - | - | - |
$1,043 38,640 kWh |
$643 77 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,004 Cost: $12,000 |
$3,004 | 137,172 | - | - | - | - | - | - | - | - | - | - |
$3,004 137,172 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $410 Cost: $100 |
$1,126 | 41,710 | $484 | 58 | - | - | $(-800) | - | $(-400) | - | - | - |
$1,126 41,710 kWh |
$484 58 kW-months/year |
- - MMBtu |
$(-800) - $ |
$(-400) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $64,159 Cost: - |
$(-1,975) | (-73,142) | - | - | - | - | - | - | - | - | $66,134 | - |
$(-1,975) (-73,142) kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
$66,134 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $81,368 Cost: $31,936 |
$6,660 | 272,609 | $3,552 | 426 | $6,222 | 1,163 | $(-800) | - | $(-400) | - | $66,134 | - | $6,660 272,609 kWh |
$3,552 426 kW-months/year |
$6,222 1,163 MMBtu |
$(-800) - $ |
$(-400) - $ |
$66,134 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,100 Cost: $12,800 |
$5,173 | 217,522 | $1,127 | 135 | - | - | $(-800) | - | $(-400) | - | - | - | $5,173 217,522 kWh |
$1,127 135 kW-months/year |
- - MMBtu |
$(-800) - $ |
$(-400) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||