IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 2299 Textile Goods, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0301 # 06 Y:2000 06 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,000 $15,000 Not Implemented
ME0301 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $7,500 $3,600 Not Implemented
ME0301 # 04 Y:2000 04 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,346 $7,200 Not Implemented
ME0301 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,743 $35,073 Not Implemented
ME0301 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,375 $13,500 Not Implemented
ME0301 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,427 $27,427 Not Implemented
ME0214 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $816 $75 Implemented
ME0214 # 10 Y:1997 10 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,432 $6,200 Not Implemented
ME0214 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $832 $6,200 Implemented
ME0214 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $30 Implemented
ME0214 # 07 Y:1997 07 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $604 $0 Not Implemented
ME0214 # 05 Y:1997 05 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,351 $0 Implemented
ME0214 # 04 Y:1997 04 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,400 $800 Not Implemented
ME0214 # 03 Y:1997 03 1997 PURCHASE APPROPRIATELY SIZED MATERIAL $4,000 $2,840 Implemented
ME0214 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,079 $31,719 Implemented
ME0214 # 01 Y:1997 01 1997 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $24,500 $7,500 Implemented
ME0155 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,097 $20,385 Implemented
ME0155 # 06 Y:1995 06 1995 USE OPTIMUM THICKNESS INSULATION $772 $130 Implemented
ME0155 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $907 $400 Implemented
ME0155 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $952 $350 Implemented
ME0155 # 03 Y:1995 03 1995 CLOSE OFF UNNEEDED STEAM LINES $1,120 $200 Implemented
ME0155 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,904 $20,000 Implemented