IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0214 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $948 $1,058 Implemented
MI0214 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $1,320 Implemented
MI0214 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,740 $2,600 Implemented
MI0077 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,344 $100 Implemented
MI0077 # 03 Y:2004 03 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $10,968 $5,200 Implemented
MI0077 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,213 $1,200 Implemented
MI0077 # 06 Y:2004 06 2004 CONDENSE OPERATION INTO ONE BUILDING $44,015 $3,220 Implemented
UF0321 # 08 Y:2003 08 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $18,000 $4,000 Implemented
UF0321 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,954 $436 Implemented
UF0321 # 03 Y:2003 03 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,331 $45,500 Implemented
MI0021 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,250 $4,200 Implemented
MI0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $312 Implemented
UF0103 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,740 $750 Implemented
UF0103 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $251 $648 Implemented
UF0103 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,361 $36,877 Implemented
UF0016 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,132 $1,000 Implemented
UF0016 # 05 Y:1992 05 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,151 $6,110 Implemented
UF0016 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $186 $3,965 Implemented