IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0014 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,203 $4,540 Not Implemented
MU0014 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,023 $0 Implemented
MU0014 # 04 Y:2022 04 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $6,530 $0 Not Implemented
MU0014 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,680 $4,307 Implemented
MU0014 # 06 Y:2022 06 2022 USE OPTIMUM TEMPERATURE $1,469 $155 Not Implemented
MU0014 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $414 $349 Not Implemented
MU0014 # 08 Y:2022 08 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $109 $0 Implemented
MU0014 # 09 Y:2022 09 2022 RECOVER WASTE HEAT FROM EQUIPMENT $91 $261 Not Implemented
MU0014 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,107 $30,064 Not Implemented
UM0342 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $13,776 Not Implemented
UM0342 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $798 $638 Implemented
UM0342 # 01 Y:2008 01 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,661 $7,350 Not Implemented
UM0342 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,462 $515 Not Implemented
UM0342 # 06 Y:2008 06 2008 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,437 $0 Not Implemented
UM0342 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $2,824 $1,228 Not Implemented
UM0342 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,313 $7,500 Implemented
UM0255 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,984 $2,960 Not Implemented
UM0255 # 05 Y:2004 05 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,917 $8,000 Not Implemented
UM0255 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $10,323 $6,486 Implemented
UM0255 # 02 Y:2004 02 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,279 $2,497 Implemented
UM0255 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,622 $9,734 Not Implemented
UM0255 # 04 Y:2004 04 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,618 $2,500 Implemented
UM0157 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $150 Implemented
UM0157 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,224 $4,430 Implemented
UM0157 # 04 Y:2000 04 2000 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,000 $400 Not Implemented