IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0122 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,060 $5,000 Implemented
KU0122 # 01 Y:1984 01 1984 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $9,129 $5,400 Not Implemented
KU0116 # 09 Y:1984 09 1984 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,065 $3,200 Not Implemented
KU0116 # 01 Y:1984 01 1984 INSTALL SOLID WASTE INCINERATOR FOR HEAT $22,384 $41,760 Not Implemented
KU0116 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,279 $4,658 Not Implemented
KU0116 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,138 $0 Implemented
KU0116 # 04 Y:1984 04 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,182 $100 Implemented
KU0116 # 05 Y:1984 05 1984 RECOVER WASTE HEAT FROM EQUIPMENT $3,118 $525 Not Implemented
KU0116 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,515 $230 Implemented
KU0116 # 07 Y:1984 07 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $848 $0 Not Implemented
KU0116 # 08 Y:1984 08 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $410 Not Implemented
KU0116 # 10 Y:1984 10 1984 INSTALL AUTOMATIC STACK DAMPER $896 $2,095 Not Implemented
KU0116 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $316 $60 Implemented
KU0116 # 12 Y:1984 12 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $264 $160 Not Implemented
KU0101 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $199 $300 Not Implemented
KU0101 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,002 $600 Not Implemented
KU0101 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $230 $750 Not Implemented
KU0101 # 04 Y:1983 04 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $107 $0 Not Implemented
KU0101 # 05 Y:1983 05 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $410 $0 Not Implemented
KU0067 # 02 Y:1982 02 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,254 $0 Implemented
KU0067 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,109 $4,780 Not Implemented
KU0067 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $973 $139 Implemented
KU0067 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,623 $2,350 Not Implemented
KU0067 # 05 Y:1982 05 1982 INSULATE BARE EQUIPMENT $675 $100 Not Implemented
KU0067 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $420 $400 Not Implemented