IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,394

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0043 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,198 $1,770 Implemented
KG0043 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,041 $160 Implemented
KG0043 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $700 $450 Implemented
KG0043 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $307 $0 Not Implemented
UD0476 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $1,000 Implemented
UD0476 # 02 Y:1995 02 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,648 $12,000 Implemented
UD0476 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,234 $15,045 Implemented
UD0476 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,633 $10,570 Implemented
UD0476 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $2,576 $1,920 Implemented
UD0476 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,376 $7,760 Implemented
UD0476 # 07 Y:1995 07 1995 DISCONNECT BALLASTS $673 $210 Implemented
UD0476 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,903 $3,290 Implemented
AR0073 # 01 Y:1995 01 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,271 $3,600 Implemented
AR0073 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $2,641 $4,320 Not Implemented
AR0073 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,124 $300 Implemented
AR0073 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,644 $150 Implemented
AR0073 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,229 $5,120 Implemented
AR0073 # 06 Y:1995 06 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $90,655 $8,400 Not Implemented
AR0073 # 07 Y:1995 07 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $515 $600 Not Implemented
AR0073 # 08 Y:1995 08 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $515 $1,000 Implemented
AR0073 # 09 Y:1995 09 1995 MINIMIZE WATER USAGE $175 $200 Implemented
MS0036 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $156 $142 Not Implemented
MS0036 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,060 $1,510 Implemented
MS0036 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $175 $380 Not Implemented
MS0036 # 04 Y:1995 04 1995 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,275 $800 Not Implemented