IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0214 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,941 $50,000 Not Implemented
MI0214 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $1,320 Implemented
MI0214 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $564 $1,860 Not Implemented
MI0214 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $976 $1,505 Not Implemented
MI0214 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $948 $1,058 Implemented
MI0214 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,740 $2,600 Implemented
MI0077 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,105 $600 Not Implemented
MI0077 # 04 Y:2004 04 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $338 $354 Not Implemented
MI0077 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,344 $100 Implemented
MI0077 # 06 Y:2004 06 2004 CONDENSE OPERATION INTO ONE BUILDING $44,015 $3,220 Implemented
MI0077 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $133 $125 Not Implemented
MI0077 # 03 Y:2004 03 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $10,968 $5,200 Implemented
MI0077 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,213 $1,200 Implemented
MI0077 # 08 Y:2004 08 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,368 $1,635 Not Implemented
UF0321 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,598 $376 Not Implemented
UF0321 # 03 Y:2003 03 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,331 $45,500 Implemented
UF0321 # 01 Y:2003 01 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,390 $2,948 Not Implemented
UF0321 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,755 $852 Not Implemented
UF0321 # 08 Y:2003 08 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $18,000 $4,000 Implemented
UF0321 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,530 $868 Not Implemented
UF0321 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,954 $436 Implemented
UF0321 # 04 Y:2003 04 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,451 $740 Not Implemented
MI0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $312 Implemented
MI0021 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $3,634 $113 Not Implemented
MI0021 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,275 $7 Not Implemented