IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0580 # 09 Y:2005 09 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $312 $0 Not Implemented
MA0580 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,175 $6,831 Not Implemented
MA0580 # 02 Y:2005 02 2005 USE MINIMUM SAFE OVEN VENTILATION $8,663 $10,750 Not Implemented
MA0580 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,371 $34,720 Implemented
MA0580 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,798 $1,375 Implemented
MA0580 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,905 $0 Implemented
MA0580 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,479 $825 Not Implemented
MA0580 # 07 Y:2005 07 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $611 $0 Not Implemented
MA0580 # 08 Y:2005 08 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $444 $0 Not Implemented
MA0476 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $7,500 Implemented
MA0476 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,840 $40,000 Not Implemented
MA0476 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,150 $5,000 Implemented
MA0476 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $109,000 $720,000 Not Implemented
MA0476 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,750 $50,000 Not Implemented
MA0476 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,100 $24,000 Implemented
MA0476 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,130 $1,000 Implemented
MA0476 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,020 $35,000 Not Implemented
MA0476 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,790 $0 Implemented
MA0476 # 10 Y:2000 10 2000 ISOLATE HOT OR COLD EQUIPMENT $2,280 $0 Implemented
MA0476 # 11 Y:2000 11 2000 REPAIR AND ELIMINATE STEAM LEAKS $950 $500 Implemented
MA0452 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $79 $35 Implemented
MA0452 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $891 $400 Not Implemented
MA0452 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $999 $480 Implemented
MA0452 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,793 $6,075 Not Implemented
MA0452 # 01 Y:1999 01 1999 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $4,467 $7,563 Implemented