IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1510 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $3,354 $750 Implemented
UK1510 # 12 Y:2015 12 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $310 $90 Implemented
UK1510 # 11 Y:2015 11 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $427 $273 Implemented
UK1510 # 10 Y:2015 10 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $305 $886 Not Implemented
UK1510 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $445 $650 Not Implemented
UK1510 # 08 Y:2015 08 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $623 $2,031 Not Implemented
UK1510 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $849 $0 Not Implemented
UK1510 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,236 $0 Implemented
UK1510 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,527 $2,143 Implemented
UK1510 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,187 $2,890 Implemented
UK1510 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,580 $2,360 Implemented
UK1510 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $10,047 $6,250 Not Implemented
AM0674 # 01 Y:2015 01 2015 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $23,350 $24,500 Not Implemented
AM0674 # 09 Y:2015 09 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $430 $0 Not Implemented
AM0674 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $550 $275 Implemented
AM0674 # 07 Y:2015 07 2015 INSTALL SKYLIGHTS $625 $970 Not Implemented
AM0674 # 06 Y:2015 06 2015 INSULATE FEEDWATER TANK $950 $140 Not Implemented
AM0674 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,185 $500 Implemented
AM0674 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,420 $5 Not Implemented
AM0674 # 03 Y:2015 03 2015 REPAIR OR REPLACE STEAM TRAPS $2,350 $440 Implemented
AM0674 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $4,070 $3,950 Not Implemented