IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 232 Men's And Boys' Furnishings, Work Clothing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0648 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,352 $169,512 Implemented
NC0648 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $907 $1,200 Implemented
NC0648 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $75 Implemented
NC0648 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $7,874 $10,949 Implemented
NC0264 # 07 Y:2003 07 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,875 $500 Not Implemented
NC0264 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $126 $357 Not Implemented
NC0264 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $350 Implemented
NC0264 # 02 Y:2003 02 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $743 $3,100 Not Implemented
NC0264 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,182 $3,115 Not Implemented
NC0264 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $454 $630 Implemented
NC0264 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $463 $800 Not Implemented
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented
NC0264 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $160 $280 Not Implemented
NC0264 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $100 Not Implemented
NC0195 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,306 $300 Implemented
NC0195 # 07 Y:2000 07 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,632 $7,499 Not Implemented
NC0195 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,675 $50 Not Implemented
NC0195 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,839 $3,180 Implemented
NC0195 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,637 $7,260 Not Implemented
NC0195 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $7,600 $6,350 Implemented
NC0195 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $150,957 $214,000 Implemented
TN0678 # 08 Y:2000 08 2000 REDUCE EXCESS STEAM BLEEDING $350 $170 Implemented
TN0678 # 06 Y:2000 06 2000 MAKE A NEW BY-PRODUCT $6,160 $0 Not Implemented
TN0678 # 07 Y:2000 07 2000 ADD AREA LIGHTING SWITCHES $1,320 $2,660 Not Implemented
TN0678 # 02 Y:2000 02 2000 $41,280 $99,240 Not Implemented