IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2339 Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0077 # 03 Y:2004 03 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $10,968 $5,200 Implemented
MI0077 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,213 $1,200 Implemented
MI0077 # 06 Y:2004 06 2004 CONDENSE OPERATION INTO ONE BUILDING $44,015 $3,220 Implemented
MI0077 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,344 $100 Implemented
TN0444 # 01 Y:1991 01 1991 USE RADIANT HEATER FOR SPOT HEATING $1,613 $3,410 Implemented
TN0444 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $324 $360 Implemented
TN0444 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,581 $0 Implemented
TN0444 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $60 Implemented
MO0032 # 05 Y:1991 05 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $168 $50 Implemented
MO0032 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $977 $1,195 Implemented
MO0032 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,011 $368 Implemented
MO0032 # 06 Y:1991 06 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26 $0 Implemented
MO0032 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175 $721 Implemented
MO0032 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $92 Implemented
TN0359 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $144 Implemented
TN0359 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,741 $2,300 Implemented
TN0359 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,093 $2,150 Implemented
AT0072 # 09 Y:1987 09 1987 INSULATE BARE EQUIPMENT $432 $50 Implemented
KU0219 # 04 Y:1987 04 1987 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $498 $1,012 Implemented
KU0219 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $181 $400 Implemented
AT0072 # 07 Y:1987 07 1987 INSULATE BARE EQUIPMENT $335 $150 Implemented
AT0072 # 06 Y:1987 06 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,023 $5,000 Implemented
AT0072 # 05 Y:1987 05 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $19,403 $8,000 Implemented
AT0071 # 06 Y:1987 06 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $423 $2,000 Implemented
AT0071 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42 $46 Implemented