Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
SIC 234 Women's, Misses', Children's, And Infants'
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0824 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,721 $31,152 Not Implemented
OK0824 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $2,183 $8,237 Not Implemented
OK0824 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,772 $8,055 Implemented
OK0824 # 03 Y:2012 03 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,127 $23,400 Not Implemented
OK0824 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,249 $461 Not Implemented
OK0824 # 08 Y:2012 08 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,045 $162,500 Implemented
OK0824 # 02 Y:2012 02 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $21,096 $22,080 Not Implemented
OK0824 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $1,691 Implemented
OK0824 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $787 $4,095 Implemented
UU0089 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,940 $21,000 Not Implemented
UU0089 # 02 Y:2005 02 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,820 $1,500 Not Implemented
UU0089 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,700 $2,000 Implemented
UU0089 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $1,110 $4,290 Implemented
UU0089 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $33,020 $2,085 Not Implemented
UU0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $4,570 Not Implemented
UU0090 # 01 Y:2005 01 2005 AIR CONDITION ONLY SPACE NECESSARY $11,500 $225 Implemented
UU0090 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,540 $5,920 Not Implemented
UU0090 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,040 $500 Not Implemented
SF0158 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $1,474 Not Implemented
SF0158 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,055 $15,240 Not Implemented
SF0158 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,087 $4,159 Not Implemented
SF0158 # 04 Y:1999 04 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,327 $125 Not Implemented
BD0062 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $2,266 $2,400 Not Implemented
BD0062 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,507 $2,846 Not Implemented
BD0062 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $1,016 $2,275 Not Implemented