IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
Reset
SIC 235 Hats, Caps, And Millinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0462 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,454 $24,417 Implemented
LE0462 # 04 Y:2018 04 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,005 $2,000 Not Implemented
LE0462 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $226 $355 Implemented
LE0462 # 02 Y:2018 02 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $15,808 $20,000 Not Implemented
LE0462 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,915 $1,000 Implemented
MO0281 # 06 Y:2000 06 2000 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $194 $120 Not Implemented
MO0281 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,769 $2,330 Not Implemented
MO0281 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $358 $0 Not Implemented
MO0281 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,183 $2,350 Not Implemented
MO0281 # 08 Y:2000 08 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $14,183 $2,580 Not Implemented
MO0281 # 03 Y:2000 03 2000 USE SYNTHETIC LUBRICANT $226 $180 Not Implemented
MO0281 # 07 Y:2000 07 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $18,160 $3,700 Not Implemented
MO0281 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,601 $3,622 Not Implemented
MO0281 # 09 Y:2000 09 2000 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $131 $0 Not Implemented
AR0172 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $74 $120 Not Implemented
AR0172 # 05 Y:1999 05 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $9,600 $1,000 Not Implemented
AR0172 # 04 Y:1999 04 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,802 $8,767 Not Implemented
AR0172 # 03 Y:1999 03 1999 MINIMIZE WATER USAGE $352 $900 Not Implemented
AR0172 # 01 Y:1999 01 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $158 $238 Not Implemented
MO0165 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,038 $12,424 Not Implemented
MO0165 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,634 $8,046 Not Implemented
MO0165 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,357 $500 Implemented
MO0165 # 08 Y:1995 08 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $918 $1,780 Not Implemented
MO0165 # 09 Y:1995 09 1995 USE RE-USABLE FILTERS $3,640 $623 Not Implemented
MO0165 # 10 Y:1995 10 1995 TREAT AND REUSE RINSE WATERS $1,400 $1,450 Implemented