Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 2381 | Fabric Dress And Work Gloves |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0147 # 07 Y:1996 | 07 | 1996 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $4,000 | $5,400 | n/a |
UL0147 # 06 Y:1996 | 06 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $60,500 | $8,000 | n/a |
UL0147 # 05 Y:1996 | 05 | 1996 | TREAT AND REUSE RINSE WATERS | $14,800 | $10,500 | n/a |
UL0147 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,537 | $2,468 | n/a |
UL0147 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $536 | $680 | n/a |
UL0147 # 03 Y:1996 | 03 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,783 | $2,000 | n/a |
UL0147 # 04 Y:1996 | 04 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $219 | $20 | n/a |
MS0043 # 03 Y:1995 | 03 | 1995 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $221 | $0 | Implemented |
MS0043 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,171 | $1,070 | Not Implemented |
MS0043 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,474 | $1,510 | Not Implemented |
MS0043 # 04 Y:1995 | 04 | 1995 | REDUCE VENTILATION AIR | $305 | $240 | Implemented |
MS0043 # 02 Y:1995 | 02 | 1995 | INSTALL OCCUPANCY SENSORS | $1,055 | $872 | Not Implemented |
MS0043 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,215 | $9,659 | Not Implemented |
MS0036 # 05 Y:1995 | 05 | 1995 | USE SYNTHETIC LUBRICANT | $442 | $75 | Implemented |
MS0036 # 04 Y:1995 | 04 | 1995 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $3,275 | $800 | Not Implemented |
MS0036 # 03 Y:1995 | 03 | 1995 | INSTALL OCCUPANCY SENSORS | $175 | $380 | Not Implemented |
MS0036 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,060 | $1,510 | Implemented |
MS0036 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $156 | $142 | Not Implemented |
ST0027 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $674 | $537 | Implemented |
ST0027 # 10 Y:1985 | 10 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $2,513 | $417 | Implemented |
ST0027 # 09 Y:1985 | 09 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $467 | $150 | Implemented |
ST0027 # 08 Y:1985 | 08 | 1985 | BURN WASTE PAPER FOR HEAT | $5,005 | $11,000 | Not Implemented |
ST0027 # 07 Y:1985 | 07 | 1985 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,338 | $645 | Not Implemented |
ST0027 # 06 Y:1985 | 06 | 1985 | IMPROVE LUBRICATION PRACTICES | $891 | $300 | Not Implemented |
ST0027 # 05 Y:1985 | 05 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $158 | $260 | Not Implemented |