Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | INDUSTRIAL GLOVES |
NAICS | n/a |
SIC | 2381 - Fabric Dress And Work Gloves |
Sales | $10,000,000-$50,000,000 |
# of Employees | 82 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 4,000,000 Pieces |
Production Hrs. Annual | 2,340 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $80,781 | 975,674 | kWh | $0.08 |
Natural Gas | $9,473 | 1,432 | MMBtu | $6.62 |
Fuel Oil #4 | $19,250 | 3,332 | MMBtu | $5.78 |
TOTAL ENERGY COSTS | $109,504 | |||
RECOMMENDED SAVINGS* | $21,623 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,654 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #4 | Paper | Electricity Usage | Natural Gas | Fuel Oil #4 | Paper | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,782 Cost: $3,857 |
- | - | - | - | $1,782 | 309 | - | - |
- - kWh |
- - MMBtu |
$1,782 309 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $674 Cost: $537 |
- | - | - | - | $674 | 117 | - | - |
- - kWh |
- - MMBtu |
$674 117 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,478 Cost: $2,138 |
$6,478 | 78,253 | - | - | - | - | - | - |
$6,478 78,253 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,317 Cost: $1,900 |
$1,317 | 40,445 | - | - | - | - | - | - |
$1,317 40,445 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $158 Cost: $260 |
- | - | - | - | $158 | 28 | - | - |
- - kWh |
- - MMBtu |
$158 28 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $891 Cost: $300 |
$891 | 10,844 | - | - | - | - | - | - |
$891 10,844 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $2,338 Cost: $645 |
- | - | $(-142) | (-22) | $2,480 | 432 | - | - |
- - kWh |
$(-142) (-22) MMBtu |
$2,480 432 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6121 BURN WASTE PAPER FOR HEAT |
Savings: $5,005 Cost: $11,000 |
- | - | - | - | $6,249 | 1,089 | $(-1,244) | (-1,244) |
- - kWh |
- - MMBtu |
$6,249 1,089 MMBtu |
$(-1,244) (-1,244) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $467 Cost: $150 |
$467 | 5,569 | - | - | - | - | - | - |
$467 5,569 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH |
Savings: $2,513 Cost: $417 |
- | - | - | - | $2,513 | 438 | - | - |
- - kWh |
- - MMBtu |
$2,513 438 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,623 Cost: $21,204 |
$9,153 | 135,111 | $(-142) | (-22) | $13,856 | 2,413 | $(-1,244) | (-1,244) | $9,153 135,111 kWh |
$(-142) (-22) MMBtu |
$13,856 2,413 MMBtu |
$(-1,244) (-1,244) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,654 Cost: $1,104 |
$467 | 5,569 | - | - | $3,187 | 555 | - | - | $467 5,569 kWh |
- - MMBtu |
$3,187 555 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||