IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
SIC 2392 Housefurnishings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0437 # 05 Y:1991 05 1991 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,861 $0 Implemented
GT0437 # 06 Y:1991 06 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,310 $0 Implemented
GT0437 # 07 Y:1991 07 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,478 $1,000 Implemented
WI0078 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $6,074 $500 Implemented
WI0078 # 02 Y:1990 02 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,496 $16,000 Implemented
WI0078 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,659 $1,500 Implemented
WI0078 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $1,000 Implemented
WI0078 # 07 Y:1990 07 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $146 $0 Implemented
RU0067 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $619 $164 Implemented
RU0067 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,152 $0 Implemented
RU0067 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $645 $49 Implemented
RU0067 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,844 $500 Implemented
AT0105 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,053 $1,500 Implemented
AT0105 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $288 $400 Implemented
AT0105 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $804 $450 Implemented
AT0105 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,868 $7,365 Implemented
AT0105 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $882 $0 Implemented
UD0240 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,646 $10,000 Implemented
UD0240 # 02 Y:1987 02 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $289 $400 Implemented
UD0240 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $2,314 $300 Implemented
GT0305 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $771 $919 Implemented
GT0305 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,192 $6,512 Implemented
GT0305 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,049 $2,100 Implemented
GT0305 # 04 Y:1986 04 1986 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $9,350 $0 Implemented
GT0305 # 06 Y:1986 06 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,580 $0 Implemented