Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,421
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0134 # 02 Y:1984 | 02 | 1984 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,306 | $0 | Implemented |
UD0134 # 03 Y:1984 | 03 | 1984 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $4,339 | $10,000 | Implemented |
TN0209 # 01 Y:1984 | 01 | 1984 | IMPROVE LUBRICATION PRACTICES | $117 | $0 | Implemented |
TN0209 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $106 | $50 | Implemented |
TN0209 # 03 Y:1984 | 03 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $59 | $215 | Implemented |
KU0115 # 01 Y:1984 | 01 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,417 | $100 | Implemented |
KU0115 # 03 Y:1984 | 03 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,447 | $1,181 | Implemented |
KU0115 # 04 Y:1984 | 04 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $398 | $100 | Implemented |
KU0115 # 05 Y:1984 | 05 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $175 | $2,500 | Implemented |
KU0107 # 01 Y:1983 | 01 | 1983 | BURN WOOD BY-PRODUCTS FOR HEAT | $7,703 | $10,000 | Implemented |
KU0107 # 02 Y:1983 | 02 | 1983 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $931 | $1,100 | Implemented |
KU0107 # 03 Y:1983 | 03 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $372 | $300 | Implemented |
KU0107 # 04 Y:1983 | 04 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $223 | $56 | Implemented |
KU0107 # 06 Y:1983 | 06 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $565 | $210 | Implemented |
KU0107 # 07 Y:1983 | 07 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $402 | $0 | Implemented |
KU0107 # 10 Y:1983 | 10 | 1983 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $275 | $65 | Implemented |
KU0107 # 11 Y:1983 | 11 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $41 | $0 | Implemented |
TN0179 # 01 Y:1983 | 01 | 1983 | OPTIMIZE PLANT POWER FACTOR | $8,400 | $5,000 | Implemented |
TN0179 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $2,291 | $5,700 | Implemented |
TN0179 # 03 Y:1983 | 03 | 1983 | USE SOLAR HEAT TO HEAT WATER | $826 | $24,000 | Implemented |
KU0074 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,439 | $1,400 | Implemented |
KU0074 # 02 Y:1983 | 02 | 1983 | REDUCE FLUID FLOW RATES | $26,145 | $2,920 | Implemented |
KU0074 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,284 | $5,200 | Implemented |
KU0074 # 04 Y:1983 | 04 | 1983 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,370 | $1,756 | Implemented |
KU0074 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,448 | $358 | Implemented |