IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0439 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,905 $81 Implemented
IA0439 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,322 $41,595 Not Implemented
IA0439 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $662 $1,585 Implemented
IA0439 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $461 $359 Not Implemented
IA0439 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $741 $469 Implemented
IA0439 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,196 $689 Not Implemented
DS0168 # 06 Y:2000 06 2000 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $5,027 $18,608 Not Implemented
DS0168 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $1,741 $2,484 Not Implemented
DS0168 # 04 Y:2000 04 2000 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $871 $511 Implemented
DS0168 # 05 Y:2000 05 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,115 $6,647 Implemented
DS0168 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,922 $5,987 Not Implemented
DS0168 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,182 $53,350 Not Implemented
DS0166 # 08 Y:2000 08 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,210 $80,000 Implemented
DS0166 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $688 $0 Not Implemented
DS0166 # 05 Y:2000 05 2000 OPTIMIZE PLANT POWER FACTOR $2,134 $1,750 Not Implemented
DS0166 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $970 $648 Not Implemented
DS0166 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,561 $21,339 Not Implemented
DS0166 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,511 $500 Implemented
DS0166 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,974 $251 Implemented
DS0166 # 10 Y:2000 10 2000 $16,522 $4,316 Not Implemented
DS0166 # 09 Y:2000 09 2000 RECOVER AND REUSE WASTE MATERIAL $1,440 $1,175 Not Implemented
DS0166 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,174 $4,000 Not Implemented
DS0151 # 03 Y:2000 03 2000 APPLY FOR INVESTMENT INCENTIVES $709 $400 Implemented
DS0151 # 02 Y:2000 02 2000 ADOPT IN-HOUSE MATERIAL GENERATION $8,245 $4,500 Not Implemented
DS0151 # 01 Y:2000 01 2000 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,672 $192 Implemented