Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,223
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0318 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $11,668 | $20,000 | Implemented |
NC0318 # 03 Y:2005 | 03 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,275 | $18,500 | Not Implemented |
NC0318 # 04 Y:2005 | 04 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $443 | $585 | Implemented |
NC0318 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,927 | $5,332 | Not Implemented |
NC0318 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $244 | $100 | Implemented |
NC0318 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $108 | $250 | Implemented |
OR0485 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,420 | $6,500 | Not Implemented |
OR0485 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,180 | $0 | Not Implemented |
OR0485 # 03 Y:2005 | 03 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,760 | $15,400 | Not Implemented |
OR0485 # 04 Y:2005 | 04 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $64,700 | $19,500 | Not Implemented |
OR0485 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $13,480 | $12,250 | Not Implemented |
OR0485 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,250 | $0 | Not Implemented |
OR0485 # 07 Y:2005 | 07 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $64,000 | $134,000 | Not Implemented |
OR0485 # 08 Y:2005 | 08 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $735 | $2,410 | Not Implemented |
MS0279 # 01 Y:2005 | 01 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $34,961 | $10,692 | Implemented |
MS0279 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,855 | $37,579 | Implemented |
MS0279 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,062 | $6,270 | Not Implemented |
MS0279 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,624 | $418 | Implemented |
MS0279 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,820 | $10,945 | Implemented |
MS0279 # 06 Y:2005 | 06 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $3,205 | $708 | Not Implemented |
MS0279 # 07 Y:2005 | 07 | 2005 | BURN WASTE OIL FOR HEAT | $1,181 | $4,586 | Not Implemented |
TA0098 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,725 | $0 | Not Implemented |
TA0098 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,320 | $460 | Implemented |
TA0098 # 03 Y:2005 | 03 | 2005 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $1,600 | $0 | Not Implemented |
TA0098 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $473 | $0 | Implemented |