IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0265 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $512 $116 Not Implemented
IA0265 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $887 Not Implemented
IA0265 # 04 Y:2001 04 2001 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $18,000 $22,100 Implemented
IA0265 # 05 Y:2001 05 2001 MOVE PRODUCT USING MECHANICAL MEANS $96,543 $50,000 Not Implemented
IA0265 # 06 Y:2001 06 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $11,603 $1,088 Implemented
UF0274 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,583 $470 Implemented
UF0274 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,473 $1,218 Not Implemented
UF0274 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $989 $0 Implemented
UF0274 # 04 Y:2001 04 2001 KEEP EQUIPMENT CLEAN $30,658 $15,840 Implemented
UF0274 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $2,476 $300 Not Implemented
UF0274 # 06 Y:2001 06 2001 OPTIMIZE PLANT POWER FACTOR $16,800 $27,000 Implemented
UF0274 # 07 Y:2001 07 2001 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $1,214,675 $4,500,000 Not Implemented
UF0274 # 08 Y:2001 08 2001 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $447,000 $990,000 Not Implemented
UF0274 # 09 Y:2001 09 2001 MAKE A NEW BY-PRODUCT $1,686,712 $272,000 Not Implemented
UF0274 # 10 Y:2001 10 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $15,600 $1,200 Implemented
UF0274 # 11 Y:2001 11 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,333 $0 Implemented
UF0274 # 12 Y:2001 12 2001 IMPROVE SPACE COMFORT CONDITIONING $411,743 $9,000 Not Implemented
UF0274 # 13 Y:2001 13 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $108,000 $900,000 Implemented
UM0184 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,250 $3,000 Not Implemented
UM0184 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,900 $15,000 Implemented
UM0184 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,550 $1,600 Implemented
UM0184 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $25,000 $13,700 Implemented
UM0184 # 05 Y:2001 05 2001 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $56,800 $75,000 Implemented
UM0184 # 06 Y:2001 06 2001 CHANGE OPERATING CONDITIONS $6,800 $11,000 Not Implemented
TA0004 # 01 Y:2001 01 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $91,307 $1,161 Implemented