IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,289

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0366 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $365 $0 Implemented
OR0366 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $359 $1,200 Not Implemented
OR0366 # 04 Y:2000 04 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,570 $7,800 Not Implemented
OR0366 # 05 Y:2000 05 2000 INSTALL TIMERS AND/OR THERMOSTATS $28,188 $1,410 Implemented
TN0691 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $144,950 $100,000 Not Implemented
TN0691 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $110,155 $5,075 Not Implemented
TN0691 # 03 Y:2000 03 2000 MODIFY CURRENT INCENTIVE PROGRAM $85,000 $16,580 Not Implemented
TN0691 # 04 Y:2000 04 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,545 $18,900 Not Implemented
TN0691 # 05 Y:2000 05 2000 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $11,700 $35,640 Not Implemented
TN0691 # 06 Y:2000 06 2000 RECOVER AND REUSE WASTE MATERIAL $10,100 $0 Not Implemented
TN0691 # 07 Y:2000 07 2000 INSTALL SKYLIGHTS $2,160 $9,680 Not Implemented
TN0691 # 08 Y:2000 08 2000 USE RE-USABLE FILTERS $640 $0 Implemented
WV0201 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $132 $180 Implemented
WV0201 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,907 $3,980 Not Implemented
WV0201 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,889 $1,000 Not Implemented
WV0201 # 04 Y:2000 04 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,675 $800 Implemented
WV0201 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,544 $240 Implemented
WV0201 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,113 $720 Not Implemented
WV0201 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,718 $60 Implemented
WV0201 # 08 Y:2000 08 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,068 $300 Implemented
WV0201 # 09 Y:2000 09 2000 INSULATE BARE EQUIPMENT $922 $278 Implemented
WV0201 # 10 Y:2000 10 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,435 $530 Not Implemented
WV0201 # 11 Y:2000 11 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,887 $40 Implemented
WV0201 # 12 Y:2000 12 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,057 $500 Implemented
WV0201 # 13 Y:2000 13 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,000 $600 Not Implemented