Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Various hardwood products |
NAICS | n/a |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $1,000,000-$5,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 65,000 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $104,121 | 954,572 | kWh | $0.11 |
Electricity Demand | $30,441 | 3,456 | kW-months/year | $8.81 |
LPG | $60,213 | 10,492 | MMBtu | $5.74 |
TOTAL ENERGY COSTS | $198,975 | |||
RECOMMENDED SAVINGS* | $52,587 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,172 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | By-product Production | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $13,365 Cost: $13,000 |
$(-1,187) | (-15,826) | - | - | $14,552 | 2,526 | - | - | - | - | - | - | - | - |
$(-1,187) (-15,826) kWh |
- - kW-months/year |
$14,552 2,526 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,056 Cost: $26,450 |
$6,516 | 86,753 | $3,540 | 403 | - | - | - | - | - | - | - | - | - | - |
$6,516 86,753 kWh |
$3,540 403 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,527 Cost: $9,000 |
$7,401 | 98,769 | $1,405 | 160 | $(-2,279) | (-421) | - | - | - | - | - | - | - | - |
$7,401 98,769 kWh |
$1,405 160 kW-months/year |
$(-2,279) (-421) MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,822 Cost: $340 |
$2,822 | 37,515 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,822 37,515 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,944 Cost: $5,571 |
$1,351 | 17,878 | $593 | 68 | - | - | - | - | - | - | - | - | - | - |
$1,351 17,878 kWh |
$593 68 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,025 Cost: $1,373 |
$531 | 7,034 | $494 | 56 | - | - | - | - | - | - | - | - | - | - |
$531 7,034 kWh |
$494 56 kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $827 Cost: $250 |
$827 | 11,137 | - | - | - | - | - | - | - | - | - | - | - | - |
$827 11,137 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $310 Cost: $240 |
- | - | - | - | $310 | 43 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$310 43 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $264 Cost: $380 |
$264 | 3,517 | - | - | - | - | - | - | - | - | - | - | - | - |
$264 3,517 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2123 INSULATE FEEDWATER TANK |
Savings: $173 Cost: $183 |
- | - | - | - | $173 | 26 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$173 26 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $34 Cost: $72 |
- | - | - | - | $34 | 5 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$34 5 MMBtu |
- - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $8,700 Cost: $9,500 |
- | - | - | - | - | - | $8,700 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,700 - lb |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.6125 SELL COMBUSTIBLE WASTE |
Savings: $4,000 Cost: $12,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $4,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
- - $ |
$4,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $40 Cost: - |
- | - | - | - | - | - | - | - | $40 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$40 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $2,500 Cost: $1,550 |
- | - | - | - | - | - | - | - | - | - | $2,500 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - lb |
$2,500 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $52,587 Cost: $79,909 |
$18,525 | 246,777 | $6,032 | 687 | $12,790 | 2,179 | $8,700 | - | $40 | - | $2,500 | - | $4,000 | - | $18,525 246,777 kWh |
$6,032 687 kW-months/year |
$12,790 2,179 MMBtu |
$8,700 - lb |
$40 - lb |
$2,500 - $ |
$4,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,172 Cost: $580 |
$2,822 | 37,515 | - | - | $310 | 43 | - | - | $40 | - | - | - | - | - | $2,822 37,515 kWh |
- - kW-months/year |
$310 43 MMBtu |
- - lb |
$40 - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | By-product Production | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | By-product Production |