Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,167
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0489 # 10 Y:2005 | 10 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $5,800 | $12,000 | Implemented |
OR0489 # 11 Y:2005 | 11 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $8,500 | $22,000 | Not Implemented |
OR0486 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $536,590 | $3,000 | Not Implemented |
OR0486 # 02 Y:2005 | 02 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $75,000 | $50,000 | Implemented |
OR0486 # 03 Y:2005 | 03 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $24,600 | $800 | Not Implemented |
OR0486 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,000 | $0 | Not Implemented |
OR0486 # 05 Y:2005 | 05 | 2005 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $0 | $6,900 | Implemented |
OR0486 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $6,360 | $0 | Not Implemented |
OR0486 # 07 Y:2005 | 07 | 2005 | DEVELOP STANDARD OPERATING PROCEDURES | $5,000 | $40 | Not Implemented |
OR0486 # 08 Y:2005 | 08 | 2005 | REDUCE OR ELIMINATE WASTE | $4,680 | $65 | Not Implemented |
OR0486 # 09 Y:2005 | 09 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,350 | $3,050 | Implemented |
OR0486 # 10 Y:2005 | 10 | 2005 | INSTALL AUTOMATIC PACKING EQUIPMENT | $25,000 | $49,000 | Implemented |
OR0486 # 11 Y:2005 | 11 | 2005 | USE PHOTOCELL CONTROLS | $2,700 | $1,300 | Implemented |
OR0486 # 12 Y:2005 | 12 | 2005 | INSULATE FEEDWATER TANK | $1,800 | $1,500 | Implemented |
OR0485 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,420 | $6,500 | Not Implemented |
OR0485 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $19,180 | $0 | Not Implemented |
OR0485 # 03 Y:2005 | 03 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,760 | $15,400 | Not Implemented |
OR0485 # 04 Y:2005 | 04 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $64,700 | $19,500 | Not Implemented |
OR0485 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $13,480 | $12,250 | Not Implemented |
OR0485 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,250 | $0 | Not Implemented |
OR0485 # 07 Y:2005 | 07 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $64,000 | $134,000 | Not Implemented |
OR0485 # 08 Y:2005 | 08 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $735 | $2,410 | Not Implemented |
OR0471 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,840 | $4,840 | Implemented |
OR0471 # 02 Y:2004 | 02 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,560 | $8,500 | Implemented |
OR0471 # 03 Y:2004 | 03 | 2004 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $4,600 | $7,100 | Implemented |