Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
83
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0497 # 02 Y:2001 | 02 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $22,000 | $50,000 | Implemented |
MA0497 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,603 | $62,600 | Not Implemented |
MA0497 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,314 | $28,000 | Not Implemented |
MA0497 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,298 | $17,500 | Implemented |
MA0497 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $10,200 | Not Implemented |
MA0497 # 09 Y:2001 | 09 | 2001 | INSULATE BARE EQUIPMENT | $1,884 | $2,000 | Not Implemented |
MA0497 # 07 Y:2001 | 07 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,951 | $1,200 | Implemented |
MA0497 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,424 | $2,000 | Implemented |
MA0497 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,958 | $13,000 | Not Implemented |
MA0497 # 12 Y:2001 | 12 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,325 | $4,500 | Implemented |
MA0494 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,346 | $19,000 | Implemented |
MA0494 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,732 | $5,000 | Implemented |
MA0494 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,014 | $200,000 | n/a |
MA0494 # 03 Y:2001 | 03 | 2001 | RECOVER MECHANICAL ENERGY | $18,000 | $80,000 | n/a |
MA0494 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $610 | $2,700 | Implemented |
MA0494 # 05 Y:2001 | 05 | 2001 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,536 | $24,000 | Not Implemented |
MA0494 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,263 | $13,000 | Not Implemented |
MA0494 # 09 Y:2001 | 09 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $759 | $0 | Implemented |
MA0494 # 08 Y:2001 | 08 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $476 | $500 | Not Implemented |
MA0495 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $100 | Implemented |
MA0495 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $450 | $0 | Not Implemented |
MA0495 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $460 | $0 | Implemented |
MA0495 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $500 | $600 | Implemented |
MA0495 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,530 | $2,100 | Not Implemented |
MA0495 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,900 | $0 | Implemented |