Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0497 # 02 Y:2001 | 02 | 2001 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $22,000 | $50,000 | Implemented |
MA0497 # 03 Y:2001 | 03 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,603 | $62,600 | Not Implemented |
MA0497 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,314 | $28,000 | Not Implemented |
MA0497 # 05 Y:2001 | 05 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,298 | $17,500 | Implemented |
MA0497 # 08 Y:2001 | 08 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,012 | $10,200 | Not Implemented |
MA0497 # 09 Y:2001 | 09 | 2001 | INSULATE BARE EQUIPMENT | $1,884 | $2,000 | Not Implemented |
MA0497 # 07 Y:2001 | 07 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,951 | $1,200 | Implemented |
MA0497 # 10 Y:2001 | 10 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,424 | $2,000 | Implemented |
MA0497 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,958 | $13,000 | Not Implemented |
MA0497 # 12 Y:2001 | 12 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,325 | $4,500 | Implemented |
MA0494 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,346 | $19,000 | Implemented |
MA0494 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,732 | $5,000 | Implemented |
MA0494 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,014 | $200,000 | n/a |
MA0494 # 03 Y:2001 | 03 | 2001 | RECOVER MECHANICAL ENERGY | $18,000 | $80,000 | n/a |
MA0494 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $610 | $2,700 | Implemented |
MA0494 # 05 Y:2001 | 05 | 2001 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $6,536 | $24,000 | Not Implemented |
MA0494 # 06 Y:2001 | 06 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,263 | $13,000 | Not Implemented |
MA0494 # 09 Y:2001 | 09 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $759 | $0 | Implemented |
MA0494 # 08 Y:2001 | 08 | 2001 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $476 | $500 | Not Implemented |
MA0495 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $370 | $100 | Implemented |
MA0495 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $450 | $0 | Not Implemented |
MA0495 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $460 | $0 | Implemented |
MA0495 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $500 | $600 | Implemented |
MA0495 # 02 Y:2001 | 02 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,530 | $2,100 | Not Implemented |
MA0495 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,900 | $0 | Implemented |