IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0236 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,388 $0 Not Implemented
OR0236 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,053 $12,418 Implemented
OR0236 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,163 $0 Not Implemented
OR0236 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $41,808 $12,925 Implemented
OR0236 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,389 $85,872 Implemented
OR0236 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,926 $21,000 Not Implemented
NV0029 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,805 $293 Implemented
NV0029 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $275 $200 Implemented
NV0029 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $134 $56 Not Implemented
NV0029 # 04 Y:1995 04 1995 USE PHOTOCELL CONTROLS $822 $95 Not Implemented
NV0029 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,747 $2,202 Not Implemented
NV0029 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $755 $1,020 Not Implemented
SF0057 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,829 $2,843 Implemented
SF0057 # 02 Y:1995 02 1995 INSTALL OCCUPANCY SENSORS $6,431 $11,418 Not Implemented
SF0057 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,803 $27,430 Not Implemented
SF0057 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,611 $250 Implemented
SF0057 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,669 $1,510 Implemented
SF0057 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $3,137 $4,459 Not Implemented
SF0057 # 07 Y:1995 07 1995 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $17,555 $37,000 Not Implemented
SF0057 # 08 Y:1995 08 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $142,905 $479,000 Not Implemented
AM0242 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,440 $4,020 Implemented
AM0242 # 02 Y:1995 02 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $630 $0 Implemented
AM0242 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $330 $0 Implemented
AM0242 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $100 $25 Implemented
AM0242 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $76 $100 Implemented