IAC Assessment: SF0069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 1995
Principal Product Finished Wood Door Stock
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 59,200
Annual Production 7,800 Thousand Feet
Production Hrs. Annual 4,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,063 1,991,794 kWh $0.11
Natural Gas $4,488 701 MMBtu $6.40
TOTAL ENERGY COSTS $230,551
RECOMMENDED SAVINGS* $41,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,195
Cost:
$1,746
$1,195 10,551 $1,195
10,551
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,404
Cost:
$4,680
$1,404 12,309 $1,404
12,309
kWh
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,710
Cost:
$3,150
$1,710 14,947 $1,710
14,947
kWh
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,222
Cost:
$3,227
$2,222 - $2,222
-
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,877
Cost:
$94,943
$23,877 210,434 $23,877
210,434
kWh
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$831
Cost:
$1,380
$831 7,327 $831
7,327
kWh
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$565
Cost:
-
$565 - $565
-
kWh
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,592
Cost:
-
$2,592 28,136 $2,592
28,136
kWh
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,744
Cost:
$3,255
$1,744 15,240 $1,744
15,240
kWh
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,210
Cost:
$854
$5,210 46,014 $5,210
46,014
kWh
TOTAL RECOMMENDED Savings:
$41,350
Cost:
$113,235
$41,350 344,958 $41,350
344,958
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage