IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,131

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0132 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $954 $0 Implemented
KU0132 # 13 Y:1984 13 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $662 $0 Implemented
KU0132 # 14 Y:1984 14 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $367 $800 Implemented
UD0133 # 01 Y:1984 01 1984 USE OPTIMUM THICKNESS INSULATION $5,281 $5,000 Not Implemented
UD0133 # 02 Y:1984 02 1984 USE OPTIMUM THICKNESS INSULATION $19,560 $40,500 Not Implemented
UD0133 # 03 Y:1984 03 1984 INSTALL SET-BACK TIMERS $1,754 $1,271 Implemented
UD0133 # 04 Y:1984 04 1984 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $3,629 $6,000 Implemented
UD0133 # 05 Y:1984 05 1984 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $1,721 $3,000 Not Implemented
UD0134 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $32,600 $10,000 Implemented
UD0134 # 02 Y:1984 02 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,306 $0 Implemented
UD0134 # 03 Y:1984 03 1984 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $4,339 $10,000 Implemented
UD0134 # 04 Y:1984 04 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,118 $3,218 Not Implemented
UD0134 # 05 Y:1984 05 1984 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $230 $0 Not Implemented
TN0209 # 01 Y:1984 01 1984 IMPROVE LUBRICATION PRACTICES $117 $0 Implemented
TN0209 # 02 Y:1984 02 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $106 $50 Implemented
TN0209 # 03 Y:1984 03 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $59 $215 Implemented
KU0115 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,417 $100 Implemented
KU0115 # 02 Y:1984 02 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,391 $965 Not Implemented
KU0115 # 03 Y:1984 03 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,447 $1,181 Implemented
KU0115 # 04 Y:1984 04 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $398 $100 Implemented
KU0115 # 05 Y:1984 05 1984 INSTALL AUTOMATIC STACK DAMPER $175 $2,500 Implemented
TN0182 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $2,850 Not Implemented
TN0182 # 02 Y:1983 02 1983 AIR CONDITION ONLY SPACE NECESSARY $500 $1,000 Not Implemented
TN0182 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $140 $322 Not Implemented
KU0107 # 01 Y:1983 01 1983 BURN WOOD BY-PRODUCTS FOR HEAT $7,703 $10,000 Implemented