Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,223
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0107 # 10 Y:1983 | 10 | 1983 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $275 | $65 | Implemented |
KU0107 # 11 Y:1983 | 11 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $41 | $0 | Implemented |
UD0096 # 01 Y:1983 | 01 | 1983 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $31,335 | $45,000 | Not Implemented |
UD0096 # 02 Y:1983 | 02 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,706 | $0 | Not Implemented |
UD0096 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,923 | $630 | Not Implemented |
UD0096 # 04 Y:1983 | 04 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $476 | $0 | Not Implemented |
TN0179 # 01 Y:1983 | 01 | 1983 | OPTIMIZE PLANT POWER FACTOR | $8,400 | $5,000 | Implemented |
TN0179 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $2,291 | $5,700 | Implemented |
TN0179 # 03 Y:1983 | 03 | 1983 | USE SOLAR HEAT TO HEAT WATER | $826 | $24,000 | Implemented |
KU0074 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,439 | $1,400 | Implemented |
KU0074 # 02 Y:1983 | 02 | 1983 | REDUCE FLUID FLOW RATES | $26,145 | $2,920 | Implemented |
KU0074 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,284 | $5,200 | Implemented |
KU0074 # 04 Y:1983 | 04 | 1983 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,370 | $1,756 | Implemented |
KU0074 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,448 | $358 | Implemented |
KU0074 # 06 Y:1983 | 06 | 1983 | REPAIR AND ELIMINATE STEAM LEAKS | $2,905 | $100 | Implemented |
KU0074 # 07 Y:1983 | 07 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $841 | $238 | Implemented |
KU0074 # 08 Y:1983 | 08 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,687 | $9,759 | Implemented |
KU0074 # 09 Y:1983 | 09 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $851 | $306 | Implemented |
KU0074 # 10 Y:1983 | 10 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $897 | $0 | Implemented |
KU0074 # 11 Y:1983 | 11 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $345 | $0 | Implemented |
KU0074 # 12 Y:1983 | 12 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $205 | $150 | Implemented |
KU0072 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,507 | $2,164 | Not Implemented |
KU0072 # 02 Y:1983 | 02 | 1983 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $6,501 | $1,660 | Not Implemented |
KU0072 # 03 Y:1983 | 03 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $3,142 | $100 | Not Implemented |
KU0072 # 04 Y:1983 | 04 | 1983 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,843 | $0 | Not Implemented |