IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,223

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0107 # 10 Y:1983 10 1983 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $275 $65 Implemented
KU0107 # 11 Y:1983 11 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $41 $0 Implemented
UD0096 # 01 Y:1983 01 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $31,335 $45,000 Not Implemented
UD0096 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,706 $0 Not Implemented
UD0096 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,923 $630 Not Implemented
UD0096 # 04 Y:1983 04 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $476 $0 Not Implemented
TN0179 # 01 Y:1983 01 1983 OPTIMIZE PLANT POWER FACTOR $8,400 $5,000 Implemented
TN0179 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $2,291 $5,700 Implemented
TN0179 # 03 Y:1983 03 1983 USE SOLAR HEAT TO HEAT WATER $826 $24,000 Implemented
KU0074 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $24,439 $1,400 Implemented
KU0074 # 02 Y:1983 02 1983 REDUCE FLUID FLOW RATES $26,145 $2,920 Implemented
KU0074 # 03 Y:1983 03 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $14,284 $5,200 Implemented
KU0074 # 04 Y:1983 04 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,370 $1,756 Implemented
KU0074 # 05 Y:1983 05 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $1,448 $358 Implemented
KU0074 # 06 Y:1983 06 1983 REPAIR AND ELIMINATE STEAM LEAKS $2,905 $100 Implemented
KU0074 # 07 Y:1983 07 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $841 $238 Implemented
KU0074 # 08 Y:1983 08 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,687 $9,759 Implemented
KU0074 # 09 Y:1983 09 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $851 $306 Implemented
KU0074 # 10 Y:1983 10 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $897 $0 Implemented
KU0074 # 11 Y:1983 11 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $345 $0 Implemented
KU0074 # 12 Y:1983 12 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $205 $150 Implemented
KU0072 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,507 $2,164 Not Implemented
KU0072 # 02 Y:1983 02 1983 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,501 $1,660 Not Implemented
KU0072 # 03 Y:1983 03 1983 INSTALL TIMERS AND/OR THERMOSTATS $3,142 $100 Not Implemented
KU0072 # 04 Y:1983 04 1983 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,843 $0 Not Implemented