IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0478 # 04 Y:2000 04 2000 INSULATE FEEDWATER TANK $3,300 $2,500 Implemented
MA0478 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $50,450 $222,000 Not Implemented
MA0478 # 02 Y:2000 02 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,000 $40,000 Not Implemented
MA0478 # 03 Y:2000 03 2000 OPTIMIZE PLANT POWER FACTOR $6,350 $5,500 Implemented
MA0478 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,960 $0 Implemented
MA0478 # 06 Y:2000 06 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,870 $13,000 Not Implemented
MA0478 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,000 $550 Implemented
MA0478 # 08 Y:2000 08 2000 PAY BILLS ON TIME TO AVOID LATE FEES $1,244 $0 Not Implemented
MA0478 # 09 Y:2000 09 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,080 $2,000 Not Implemented
MA0478 # 10 Y:2000 10 2000 INSTALL OCCUPANCY SENSORS $320 $450 Implemented
ME0295 # 10 Y:2000 10 2000 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $27,000 $1,512 Not Implemented
ME0295 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,961 $72,500 Not Implemented
ME0295 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,533 $20,900 Not Implemented
ME0295 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,918 $11,100 Not Implemented
ME0295 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,043 $860 Not Implemented
ME0295 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,424 $210 Not Implemented
ME0295 # 06 Y:2000 06 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,656 $1,330 Not Implemented
ME0295 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $815 $1,600 Not Implemented
ME0295 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $112 $130 Not Implemented
ME0295 # 09 Y:2000 09 2000 MAKE A NEW BY-PRODUCT $15,041 $21,330 Not Implemented
MA0363 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $410 $0 Implemented
MA0363 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $723 $700 Not Implemented
MA0363 # 05 Y:1996 05 1996 UPGRADE OBSOLETE EQUIPMENT $1,801 $4,300 Not Implemented
MA0363 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,549 $325 Implemented
MA0363 # 03 Y:1996 03 1996 USE POWER DURING OFF-PEAK PERIODS $7,680 $0 Not Implemented